Using FDTD to study the medium Magnetostrictive Guided Wave Characterization for Anchor Rod Corrosion of High-voltage Transmission Tower 理想介质中电磁导波特性的FDTD分析高压输电线塔锚杆腐蚀的电磁导波信号表征
You can now anchor structures that only require power while the control tower is in reinforced mode. 现在,只要有足够的能量栅格,你甚至可以在控制塔处于增强模式下锚定建筑。
Magnetostrictive Guided Wave Characterization for Anchor Rod Corrosion of High-voltage Transmission Tower 高压输电线塔锚杆腐蚀的电磁导波信号表征
Local Stress Analysis of Anchor Pedestal of Cable Stayed Bridge Tower 斜拉桥桥塔锚座局部应力分析
Discussion on JS_2 anchor tower used as branching tower JS2铁塔作线路分支塔的探讨
Numerical Simulation and Analysis for Stresses Distribution Difference in Different Cable Anchor Plane Direction of the Segment of Cable Tower of Cable-stayed Bridge 斜拉索锚板方位对斜拉桥索塔节段应力分布影响的数值模拟分析
Cable supporting crane adopts the structure that pylon hinges in longitudinal direction, main cable and back anchor moves 2 × 11.3 m in the transverse direction, and the main cable lengthwise slides on the top of tower. 缆索吊机采用塔架纵向铰接,主索与后锚横向移动(2×11.3)m,主索在塔顶纵向滑动的结构形式。
Setting and controlling of prestress of anchor bolt for tower equipment 塔器设备地脚螺栓预紧力的设定与控制
Attachment anchor for tower crane 塔式起重机附着锚固方法
Some standards on the selection of skirt material and anchor bolt material in tower design were compared, and some suggestions were put forward. 对各标准中有关塔器裙座和地脚螺栓材料选用的内容进行了对比,并提出了自己的观点。
The distribution formula of horizontal component force between steel anchor cell and concrete tower wall was deduced then. 在此基础上推导了水平分项索力在钢锚箱和混凝土塔壁之间的分配计算公式。
To ensure operation of transmission line safely, the arcing gap of insulator was developed and installed, and arrester was installed one after another on anchor tower and high tower. 为保证线路安全运行,研制安装了保护绝缘子串的引弧间隙,并先后在锚塔和高塔上安装了避雷器。
Selection of skirt material and anchor bolt material in tower design 塔器设计中裙座及地脚螺栓材料选用
This paper describes the stress distribution characteristics and local reinforcing measures for the anchor pedestal of the cable stayed bridge tower through local analysis of stress distribution of a certain bridge tower. 通过对某一斜拉桥桥塔锚座处局部应力分布的分析,说明斜拉桥桥塔柱锚座处应力分布特征及其局部设计补强措施。
Engineers tried to adopt the anchor rod static pressure pile technology in design of tower crane foundations and this technology can improve synthetical benefit of projects. 针对这一情况,尝试在塔式起重机基础中应用锚杆静压桩,这对提高工程综合效益具有较大的意义。
JS_2 tower is usually designed to be used as triple-circuit anchor tower, but it can be used as branching tower under some circumstances. JS2塔被设计用做单杆三回线路的耐张转角塔,但在一定条件下,可以被利用作为线路分支塔。
The third one is on the local forced performance of stay cable anchor block, studied from three ways as girder anchorage, cable tower anchorage as well as anti-sliding. 第三部分,斜拉索锚固块的局部分析,主要从主梁锚固,索塔锚固以及抗滑移三个方面进行分析研究。
However, the value reduces much more when transmission line and anchor towers are all considered. Secondly, static and dynamic response analysis of long span transmission tower under tornado loading is calculated. 其次,进行了龙卷风下的大跨越输电塔的静、动态响应分析。